Measure results · 3 pages

30/60/90-day check after go-live

Check whether the new workflow is still performing, where workers use workarounds, and what must change next.

Fill it in online · Print or save as PDF · Your entries are not uploadedNot sure about a term? Open the plain-English glossary
How to use this worksheet
  1. Fill it out with workers who do the job.
  2. Use actual observations or system records.
  3. If an answer is uncertain, write what still needs to be checked.

Your answers stay only in this open page. Print or save a PDF before closing or reloading it.

Use this when

After a workflow go-live or scaled test.

See a filled-example scenario

Picking reaches 90 lines/hour by day 60, but night shift remains at 84 and generates twice as many support calls.

The gray examples inside the fields show the level of detail expected. They are examples only and are not saved as answers.
Warehouse Workflow Lab

30/60/90-day check after go-live

Published by Voodoo Robotics · workflows.voodoorobotics.com

01

Performance review

What to do: Use one row per metric and keep the metric definition the same at every check.

This section is a list.Use one row for each task, observation, test, person, field, or requirement. Add more rows when needed.
Metric nameName the exact measurement used at baseline, 30, 60, and 90 days.
BaselineEnter the result measured before the new workflow began, using the same definition as later checks.
30-day resultEnter the 30-day result using the unchanged metric definition.
60-day resultEnter the 60-day result using the unchanged metric definition.
90-day resultEnter the 90-day result using the unchanged metric definition.
TargetUse a numeric limit that clearly means pass, pause, or fail.
CommentWrite one specific fact, concern, or item still needing proof.
02

Operational health

What to do: Look for support work or workarounds that may hide the true cost.

03

People and standard work

What to do: Check whether workers can follow the process without extra help.

04

Decision

What to do: Choose the next small, controlled action.

Keep related photos, drawings, reports, and system records with the saved PDF. This worksheet does not replace site-specific safety, quality, regulatory, or engineering review.

Reviewed byDate
← All practical worksheets