Connect systems · 3 pages

WMS integration field map

Show how each piece of information moves from one system to another and what happens when it is missing or wrong.

Fill it in online · Print or save as PDF · Your entries are not uploadedNot sure about a term? Open the plain-English glossary
How to use this worksheet
  1. Fill it out with workers who do the job.
  2. Use actual observations or system records.
  3. If an answer is uncertain, write what still needs to be checked.

Your answers stay only in this open page. Print or save a PDF before closing or reloading it.

Use this when

Connecting warehouse management system (WMS), business system (ERP), manufacturing system (MES), devices, middleware, or local workflow software.

See a filled-example scenario

The WMS field location_code maps to the display field location, is trimmed and uppercased, and must match an active location.

The gray examples inside the fields show the level of detail expected. They are examples only and are not saved as answers.
Warehouse Workflow Lab

WMS integration field map

Published by Voodoo Robotics · workflows.voodoorobotics.com

01

Interface control

What to do: Name systems and contract.

02

Field mapping

What to do: Map semantics, not only column names.

This section is a list.Use one row for each task, observation, test, person, field, or requirement. Add more rows when needed.
Business meaningExplain what the field means in warehouse terms.
Source fieldEnter the exact field or column name in the sending system.
Destination fieldEnter the exact field or column name in the receiving system.
Type / formatState the data type and required shape.
Required / optionalChoose whether the field is always required, optional, or required only under a named condition.
TransformationExplain how the value changes between systems.
ValidationState the rule that decides whether the received value is acceptable.
ExampleGive one specific warehouse example that clearly fits this definition.
03

Failure handling

What to do: Protect idempotency and observability.

04

Change control

What to do: Keep versions compatible.

Keep related photos, drawings, reports, and system records with the saved PDF. This worksheet does not replace site-specific safety, quality, regulatory, or engineering review.

Reviewed byDate
← All practical worksheets